Minerra Ghana · Tailings Reprocessing

Recovering gold. Restoring land. Creating value.

Minerra Ghana transforms historic mine tailings into valuable gold while reducing environmental impact through advanced mineral processing technologies.

Explore our process Speak to an expert →
AUGold
USD$4,130.00/ oz
+0.90%
AUGold · gram
USD$132.45/ g
+0.90%
AGSilver
USD$61.13/ oz
+3.22%
PTPlatinum
USD$1,623.90/ oz
+2.00%
PDPalladium
USD$1,275.00/ oz
+2.03%
CUCopper
USD$13,668.65/ t
+2.47%
ALAluminium
USD$3,138.50/ t
+0.44%
MNManganese
USD$5.20/ dmtu
0.00%
Minerra Ghana gold tailings processing plant worker
Who We Are

Africa's leader in sustainable gold recovery from mine tailings.

Minerra Ghana transforms historic mine tailings into valuable gold — while reducing environmental liabilities across West Africa's mining belt.

Advanced mineral processing

Gravity concentration, flotation and carbon-in-leach circuits engineered for legacy tailings mineralogy — recovering the gold yesterday's plants left behind.

Environmental rehabilitation

Every project ends with cover systems, native-species revegetation and long-term monitoring — legacy environmental liabilities converted into rehabilitated ground.

Ghanaian owned, globally aligned

Fully Ghanaian-owned. Compliance framework aligned to the Minerals Commission, EPA Ghana, GISTM tailings guidelines and Tier-1 contractor pre-qualification standards.

We combine deep local knowledge — Ghana's varied geology, its regulatory framework, the community dynamics that shape every mine site — with the engineering precision that large-scale producers expect from their contractors.

The Tailings Challenge

Yesterday's mines left behind more than pits. Across Ghana's mining belt, historic tailings storage facilities hold billions of tonnes of processed rock — and with it, unrecovered gold, environmental liability, and a chance to do better.

01 / What they are

Mine tailings, explained.

Tailings are the fine ground rock left after ore has been milled and metal extracted — typically stored as slurry behind engineered dams for decades.

02 / The concern

An environmental liability.

Legacy TSFs risk seepage into groundwater, dust migration, and catastrophic dam failure. They occupy productive land that could be rehabilitated.

03 / The value

Gold left in the ground.

Historic recovery rates of 60–70% mean today's higher-efficiency circuits can extract meaningful grade — 0.6–1.2 g/t Au is common in Ghana's older TSFs.

04 / Why it matters

Reprocessing heals the land.

Every tonne re-processed shrinks the dam, recycles the water, and hands back rehabilitated ground — commercial return and environmental return, together.

Investors

A resource opportunity already mined once.

Legacy tailings offer a rare combination for institutional capital: defined resource, near-surface access, lower ESG risk than greenfield, and a clear rehabilitation exit.

Request investor deck Speak to founders →
$1.2B
Addressable resource

Estimated in-situ gold across Ghana's characterised legacy TSFs at current spot.

87%
Target recovery

From feedstock previously milled to only 60–70% recovery — the modern uplift.

18mo
To first pour

From resource statement through commissioning, on already-permitted TSF ground.

0ha
New land disturbed

Zero greenfield footprint — a materially lower ESG-risk profile than new-pit projects.